Category:Proposed coal plants in Andhra Pradesh

From SourceWatch
Jump to: navigation, search

This article is part of the Coal Issues portal on SourceWatch, a project of CoalSwarm and the Center for Media and Democracy. See here for help on adding material to CoalSwarm.

This article is part of the CoalSwarm coverage of India and coal.
Sub-articles:

For a table of over 500 proposed coal plants in India, sortable by state, project name, sponsor, size, status, and CO2 emissions, see Proposed coal plants in India.

Unit Plant Other Names Company Parent MW Status Year Type of Coal Technology Permits Latitude Longitude Accuracy Village Taluk District
Adilibad power station (Shalivahana Power Corp.) Adilibad power station (Shalivahana Power Corp.) Shalivahana Power Corp. 300 Uncertain 19.159958 79.530837 approximate Achalapur Adilabad
Ankulapatur power station phase 1 Ankulapatur power station VSF Projects 350 Construction Supercritical 14.1383443 79.9908811 exact Ankulapatur Chillakur Nellore
Ankulapatur power station phase 2 Ankulapatur power station VSF Projects 135 Planning Supercritical 14.1383443 79.9908811 exact Ankulapatur Chillakur Nellore
Bander power station Stage I Bander power station Pynampuram Thermal Power Project, Krishnapatnam Gayatri Thermal Powertech Corporation 1320 Permitted Mahanadi Coal Fields Supercritical EC 4 Nov 2009 at http://bit.ly/1kopZNe 14.3491736 80.1592219 approximate Painampuram Muthukur Nellore
Bander power station Stage II Bander power station Thermal Powertech Corporation 660 Permitted Mahanadi Coal Fields Supercritical EC 4 Nov 2009 at http://bit.ly/1kopZNe 14.3491736 80.1592219 approximate Painampuram Muthukur Nellore
Bander power station Stage III Bander power station Thermal Powertech Corporation 660 Early development Mahanadi Coal Fields Supercritical TOR 12 Mar 2010 at http://bit.ly/1joHahH 14.3491736 80.1592219 approximate Painampuram Muthukur Nellore
Bhavanapadu Thermal Power Project Unit 1 Bhavanapadu Thermal Power Project East Coast Energy 660 Construction 70 % Indian, 30% imported Supercritical EC 9 Apr 2009 at http://bit.ly/1kp2kw8 18.5213851 84.2393124 exact Kakrapalli Santhabommali Srikakulam
Bhavanapadu Thermal Power Project Unit 2 Bhavanapadu Thermal Power Project East Coast Energy 660 Construction 70 % Indian, 30% imported Supercritical EC 9 Apr 2009 at http://bit.ly/1kp2kw8 18.5213851 84.2393124 exact Kakrapalli Santhabommali Srikakulam
Bhavanapadu Thermal Power Project Unit 3 Bhavanapadu Thermal Power Project East Coast Energy 660 Deferred Imported Supercritical EC 9 Apr 2009 at http://bit.ly/1kp2kw8 18.5213851 84.2393124 exact Kakrapalli Santhabommali Srikakulam
Bhavanapadu Thermal Power Project Unit 4 Bhavanapadu Thermal Power Project East Coast Energy 660 Deferred Imported Supercritical EC 9 Apr 2009 at http://bit.ly/1kp2kw8 18.5213851 84.2393124 exact Kakrapalli Santhabommali Srikakulam
Budele power station Budele power station Indu Projects Limited 1000 Unconfirmed 14.670709 77.590744 approximate Budele Anantapur
Devarampadu power station Devarampadu power station Coastal Sirohi Power 1320 Early development Imported Supercritical TOR 26 July 2011 at http://bit.ly/1eLBpqK 15.5 80.05 approximate (location of Ongole) Devarampadu Ongole Prakasam
Dharmavaram power station Dharmavaram power station Nava Bharat Ventures Ltd 150 Deferred 14.413745 77.712619 approximate Dharmavaram
Dr. RKP Power Ankulapatur power station phases 1 and 2 Dr. RKP Power Ankulapatur power station Dr. RKP Power 420 Announced 14.130902 79.864683 approximate Ankulapattur Chillakur Nellore
Gopuvanipalam Mega Thermal Power Project (Chinnapuram, Machilipatnam) Gopuvanipalam Mega Thermal Power Project (Chinnapuram, Machilipatnam) Nagarjuna Construction Company Is Krishnapatnam Power Generation the special purpose vehicle here? EC at http://bit.ly/1kp29kv 1980 Early development 70% Indian, 30% imported Supercritical TOR 13 Aug 2009 at http://bit.ly/1joHmxt 16.18438 81.134933 exact Chinnapuram, Machilipatnam Krishna
Gudur Thermal Power Project (Momidi) Phases I and II Gudur Thermal Power Project (Momidi) Pragdisa Power Private Ltd 2640 Planning Supercritical TOR 9 Sep 2010 at http://bit.ly/1joGeK3 14.130902 79.864683 Momidi Chillakur Nellore
Gunipudi power station (NBPL proposal) Gunipudi power station (NBPL proposal) Namratha Bizili Private Limited 300 Deferred 17.300117 82.614386 approximate Gunipudi, Pentakota Payakaraopet Visakhapatanam
Gunipudi power station (STEAPL proposal) Gunipudi power station (STEAPL proposal) Suryachakra Group 1320 Early development Imported Supercritical TOR July 26, 2011 at http://bit.ly/1eLBJFZ; TOR extension 19 Dec 2013 at http://bit.ly/1eLBRFh 17.300117 82.624386 approximate Gunipudi, Pentakota Nakkapalli Vishakapatnam
Hindupur power station Hindupur power station Sheshadri Power & Infrastructure 1320 Unconfirmed 13.830371 77.490084 approximate Hindupur Mahaboobnagar
Jharapudi power station Jharapudi power station Suryachakra Group 140 Unconfirmed 70% imported, 30% indigenous TOR 2 June 2009 at http://bit.ly/1joHz3I 18.3 83.9 approximate Jharupudi Srikakulam
Kakatiya Thermal Power Project Stage-II Kakatiya Thermal Power Project Stage-II Andhra Pradesh Power Generation Corporation (APGENCO) 600 Construction 2014 Tadicherla Mines of Singaren Subcritical EC 5 FEb 2009 at http://bit.ly/1kp9gtn 18.3831934 79.8271644 exact Chelpur Ghanpur Warrangal
Kineta Power Stage I (Krishnapatnam) Kineta Power thermal station Kineta Power Limited 1320 Permitted Indonesia Supercritical EC 25 Jan 2012 at http://bit.ly/1g4zeyd 14.166667 80.083333 exact Thaminapatnam Chilakul Nellore
Kineta Power Stage II (Krishnapatnam) Kineta Power thermal station Kineta Power Limited 660 Permitted Indonesia Supercritical EC 25 Jan 2012 at http://bit.ly/1g4zeyd 14.166667 80.083333 exact Thaminapatnam Chilakul Nellore
Komarada power station Unit 1 Komarada power station Alfa Infraprop Pvt. Ltd. 660 Permitted Indonesia Supercritical EC 15 Mar 2010 at http://bit.ly/1g4GNEX 18.89626 83.468899 approximate Komarada Vizianagaram
Komarada power station Unit 2 Komarada power station Alfa Infraprop Pvt. Ltd. 660 Permitted Indonesia Supercritical EC 15 Mar 2010 at http://bit.ly/1g4GNEX 18.89626 83.468899 approximate Komarada Vizianagaram
Komarada power station Unit 3 Komarada power station Alfa Infraprop Pvt. Ltd. 660 Permitted Indonesia Supercritical EC 15 Mar 2010 at http://bit.ly/1g4GNEX 18.89626 83.468899 approximate Komarada Vizianagaram
Komarada power station Unit 4 Komarada power station Alfa Infraprop Pvt. Ltd. 660 Permitted Indonesia Supercritical EC 15 Mar 2010 at http://bit.ly/1g4GNEX 18.89626 83.468899 approximate Komarada Vizianagaram
Kotapally power station (SKIL Group) Kotapally power station (SKIL Group) SKIL Group 600 Unconfirmed 18.9286 79.8176 approximate Kotapally Chennur Adilabad
Kothagudem Unit 11 Kothagudem Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 500 Operating 2011 EC 5 Jan 2007 at http://bit.ly/1eLbOOK 17.6219 80.69355 exact Paloncha Khamman
Kothagudem Unit 12 Kothagudem Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 800 Early development Supercritical TOR 26 Sept 2012 at http://bit.ly/1eLwoyp 17.6219 80.69355 exact Paloncha Khamman
Kothagudem TPS expansion Kothagudem Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 800 Planning 17.6092 80.7248 exact Paloncha
Krishnapatnam Navayuga thermal station Phase I Krishnapatnam Navayuga thermal station Navayuga Power 1320 Advanced development Supercritical 14.288601 80.124848 approximate Krishnapatnam Nellore
Krishnapatnam Navayuga thermal station Phase II Krishnapatnam Navayuga thermal station Navayuga Power 660 Planning Supercritical 14.288601 80.134848 approximate Krishnapatnam Nellore
Krishnapatnam Ultra Mega Power Project 1-6 Krishnapatnam Ultra Mega Power Project Coastal Andhra Power Reliance Power 3960 Deferred Imported EC 23 Oct 2007 at http://bit.ly/1gfdLBs 14.2520611 80.1207483 exact Krishnapatnam Nellore
Latchayapeta power station Latchayapeta power station NCS Sugars Ltd. 600 Planning 18.57287 83.358673 approxiamte Latchayapeta Bobbili Vizianagaram
Lovapalem power station Lovapalem power station My Home Power Ltd. 1000 Unconfirmed IPP list 17.466444 82.961361 approximate Lovapalem Visakhapatnam
Meenakshi Energy Thermal Power Project Phase-I Unit 1 Meenakshi Energy Thermal Power Project Meenakshi Energy 150 Operating 2012 70% domestic, 30% imported EC 19 Oct 2009 at http://bit.ly/1eKx72M 14.235278 80.104444 approximate Thammenapatnam Chillakuru Nellore
Meenakshi Energy Thermal Power Project Phase-I Unit 2 Meenakshi Energy Thermal Power Project Thamminapatnam Meenakshi Energy 150 Operating 2013 70% domestic, 30% imported EC 19 Oct 2009 at http://bit.ly/1eKx72M 14.235278 80.104444 approximate Thammenapatnam Chillakuru Nellore
Meenakshi Energy Thermal Power Project Phase-II Meenakshi Energy Thermal Power Project Thamminapatnam Meenakshi Energy 700 Uncertain 70% domestic, 30% imported EC 19 Oct 2009 at http://bit.ly/1koZ0kM; EC compliance form: http://bit.ly/1koYLX0; EC extension 9 Oct 2013 at http://bit.ly/1koZ6ss 14.235278 80.104444 approximate Thammenapatnam Chillakuru Nellore
Meenakshi Energy Thermal Power Project Phase-III Meenakshi Energy Thermal Power Project Thamminapatnam Meenakshi Energy 1320 Early development TOR 9 Dec 2010 at http://bit.ly/1joFDIp 14.235278 80.104444 approximate Thammenapatnam Chillakuru Nellore
Meghavaram Kakarapalli power station Meghavaram Kakarapalli power station Meghavaram Power 450 Deferred 17.484945 82.494903 approximate Kakarapalli Santhabommali Srikakulam
Muthukur Mandal power station (Painampuram) Unit 1 Muthukur Mandal power station (Painampuram) Nelcast Energy Corporation Ltd Krishnapatnam Nelcast 660 Permitted Imported from Indonesia Supercritical EC 30 Sept 2010 at http://bit.ly/1g4Ekuk 15.588629 78.266836 approximate Painampuram & Sivarampuram Muthukur Nellore
Muthukur Mandal power station (Painampuram) Unit 2 Muthukur Mandal power station (Painampuram) Nelcast Energy Corporation Ltd Krishnapatnam Nelcast 660 Permitted Imported from Indonesia Supercritical EC 30 Sept 2010 at http://bit.ly/1g4Ekuk 15.588629 78.266836 approximate Painampuram & Sivarampuram Muthukur Nellore
Nagarjuna Construction Company Sompeta Thermal Plant Phase I Nagarjuna Construction Company Sompeta Thermal Plant Nagarjuna Construction Company 1320 Cancelled Mahanadi Coal Field Supercritical EC 9 Dec 2009 at http://bit.ly/1g4HA8Z 18.9374 84.590157 approximate Sompeta Srikakulam
Nagarjuna Construction Company Sompeta Thermal Plant Phase II Nagarjuna Construction Company Sompeta Thermal Plant Nagarjuna Construction Company 1320 Cancelled Mahanadi Coal Field Supercritical EC 9 Dec 2009 at http://bit.ly/1g4HA8Z 18.9374 84.590157 approximate Sompeta Srikakulam
Nakkapalle power station Unit 1 Nakkapalle power station Green Valley Energy Ventures 660 Early development Imported TOR 26 July 2011 at http://bit.ly/1joDKLE 17.4096508 82.7147877 approximate DL Puram, Nellipudi, Gunipudi Nakkapalli Visakhapatnam
Nakkapalle power station Unit 1 Nakkapalle power station Green Valley Energy Ventures 660 Early development Imported TOR 26 July 2011 at http://bit.ly/1joDKLE 17.4096508 82.7147877 approximate DL Puram, Nellipudi, Gunipudi Nakkapalli Visakhapatnam
NCC Vamsadhara Mega Power Project NCC Vamsadhara Mega Power Project Nagarjuna Construction Company 1960 Unconfirmed Supercritical 18.9374 84.590157 approximate Sompeta Srikakulam
Ontimavadi power station Ontimavadi power station GMR Energy 6300 Planning TOR 27 Apr 2010 at http://bit.ly/1joGmt0 16.945181 82.238647 Ontimavadi East Godavari
Paloncha power station expansion #1 Paloncha power station Nava Bharat Ventures Ltd 150 Construction 17.622611 80.696855 exact
Paloncha power station expansion #2 Paloncha power station Nava Bharat Ventures Ltd 150 Planning 17.622611 80.696855 exact
Pedaganjam power station (Sravanthi) Unit 1 Pedaganjam power station (Sravanthi) Sravanthi Power 700 Early development Supercritical TOR 18 May 2011 at http://bit.ly/1joEz7l 15.7 80.25 approximate Peddaganjam Chinnaganjam Prakasam
Pedaganjam power station (Sravanthi) Unit 2 Pedaganjam power station (Sravanthi) Sravanthi Power 700 Early development Supercritical TOR 18 May 2011 at http://bit.ly/1joEz7l 15.7 80.25 approximate Peddaganjam Chinnaganjam Prakasam
Pedaganjam power station (Sew) Unit 1 Pedaganjam power station (Sew) Sew Thermal Power Corporation 660 Early development Supercritical TOR 13 May 2011 at http://bit.ly/1joFcxL 15.7 80.25 approximate Peddaganjam Chinnaganjam Prakasam
Pedaganjam power station (Sew) Unit 2 Pedaganjam power station (Sew) Sew Thermal Power Corporation 660 Early development Supercritical TOR 13 May 2011 at http://bit.ly/1joFcxL 15.7 80.25 approximate Peddaganjam Chinnaganjam Prakasam
Pegadapalli (Jaipur Mandal) power station Unit 1 Pegadapalli (Jaipur Mandal) power station Adilabad power staion; Jaipur power station Singareni Collieries Srirampur Coalfields 600 Construction Sriiampur coal fields EC 27 Dec 2010 at http://bit.ly/1g4zVrb 18.8270561 79.5702839 exact Pagadapalli Jaipur Adilabad
Pegadapalli (Jaipur Mandal) power station Unit 2 Pegadapalli (Jaipur Mandal) power station Adilabad power staion; Jaipur power station Singareni Collieries Srirampur Coalfields 600 Construction Sriiampur coal fields EC 27 Dec 2010 at http://bit.ly/1g4zVrb 18.8270561 79.5702839 exact Pagadapalli Jaipur Adilabad
Pentakota power station Pentakota power station Namratha Bizili Private Limited 150 Deferred 17.300117 82.614386 approximate Pentakota Tuni East Godavary
Pentakota power station (Srinivasam Energy) Pentakota power station (Srinivasam Energy) Srinivasam Energy Limited 1320 Unconfirmed Supercritical 17.300117 82.614386 approximate Pentakota Tuni East Godavary
Pudimadaka Ultra Mega Power Project Pudimadaka Ultra Mega Power Project NTPC 4000 Advanced development Supercritical 17.492713 83.002767 approximate Pudimadaka
Ramagundam Stage-IV Ramagundam power station Krishnapatnam Gayatri NTPC 1000 Early development Subcritical TOR 8 Dec 2010 at http://bit.ly/1joFNiU 18.7572 79.456 exact Ramagundam Ramagundam Karimnagar
Rayalaseema Thermal Power Project Unit 5 Rayalaseema Thermal Power Project Andhra Pradesh Power Generation Corporation (APGENCO) 210 Operating 2011 Mahanadi Coal Fields Subcritical EC 1 May 2008 at http://bit.ly/1eL8ovh 14.704 78.4577 exact Rayalseema Yerraguntla Kapada
Rayalaseema Thermal Power Project Unit 6 Rayalaseema Thermal Power Project Andhra Pradesh Power Generation Corporation (APGENCO) 600 Construction Mahanadi Coal Fields Subcritical EC 21 Oct 2010 at http://bit.ly/1g4CUjn 14.704 78.4577 exact Rayalseema Yerraguntla Kapada
Saggonda power station Saggonda power station Andhra Sugars 120 Planning 16.43 81.09 approximate Saggonda West Godavari
Sattupally Thermal Power Station Sattupally Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 600 Early development 17.208012 80.829475 approximate Sattupally
Sigma Infrarop power station (Khamman) Sigma Infrarop power station (Khamman) Sigma Infrarop Ltd 2640 Unconfirmed 17.247253 80.151445 approximate Khamman
Simhadri power station Unit 3 Simhadri Power Station NTPC 500 Newly commissioned 2011 EC 1 AUg 2007 at http://bit.ly/1eL8OBX 17.591 83.09166 exact Vizag Visakhapatnam
Simhadri power station Unit 4 Simhadri Power Station NTPC 500 Newly commissioned 2012 EC 1 AUg 2007 at http://bit.ly/1eL8OBX 17.591 83.09166 exact Vizag Visakhapatnam
Sompeta power station (Suryachakra) Sompeta power station (Suryachakra) Jadupudi Suryachakra Group 1200 Unconfirmed 18.93742 84.590157 approximate Sompeta Srikakulam
Sree Siva Satyadeva Power Plant Sree Siva Satyadeva Power Plant Sree Siva Satyadeva Power Plant Pvt. 2000 Cancelled 18.3 83.9 approximate Srikakulam
Sri Damodaram Sanjeevaiah Thermal Power Station Unit 1 Sri Damodaram Sanjeevaiah Thermal Power Station Damodaram Sanjeevaiah Andhra Pradesh Power Generation Corporation (APGENCO) 800 Construction 70% domestic, 30% imported 14.288601 80.124848 approximate Nelaturu Nellore
Sri Damodaram Sanjeevaiah Thermal Power Station Unit 2 Sri Damodaram Sanjeevaiah Thermal Power Station Damodaram Sanjeevaiah Andhra Pradesh Power Generation Corporation (APGENCO) 800 Construction 70% domestic, 30% imported 14.288601 80.124848 approximate Nelaturu Nellore
Sri Damodaram Sanjeevaiah Thermal Power Station Stage II Sri Damodaram Sanjeevaiah Thermal Power Station Damodaram Sanjeevaiah Andhra Pradesh Power Generation Corporation (APGENCO) 800 Early development 70% domestic, 30% imported TOR 26 Sept 2012 at http://bit.ly/1eLxrhM and http://bit.ly/1eLxGtl 14.288601 80.124848 approximate Nelaturu Nellore
Srikakulam Thermal Power Station Srikakulam Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 2400 Early development Nuagoan & Telisahi coal blocks in Angul District, Orissa 18.3 83.9 approximate Srikakulam
Thamminapatnam power station (Simhapuri) Phase I Units 1 and 2 Thamminapatnam power station (Simhapuri) Simhapuri Energy Malaxmi, Madhucon 300 Newly commissioned 2012 Subcritical EC 3 Jul 2008 at http://bit.ly/1kpa1md 14.21333333 80.08388889 approximate Thamminapatnam Chilakur Nellore
Thamminapatnam power station (Simhapuri) Phase-II Thamminapatnam power station (Simhapuri) Simhapuri Energy Malaxmi, Madhucon 300 Construction Subcritical EC 3 Jul 2008 at http://bit.ly/1kpa1md 14.21333333 80.08388889 approximate Thamminapatnam Chilakur Nellore
Thamminapatnam power station (Simhapuri) Phase-III Thamminapatnam power station (Simhapuri) Simhapuri Energy 1320 Early development Supercritical TOR 13 May 2011 at http://bit.ly/1joETCZ 14.21333333 80.08388889 approximate Thamminapatnam Chilakur Nellore
Uppada power station Uppada power station Spectrum Power Generation 1320 Cancelled 17.0587 82.3097 exact Kakinada East Godavri
Vadarevu Ultra Mega Power Project Stage I Vadarevu Ultra Mega Power Project Andhra Pradesh Power Generation Corporation (APGENCO) 1600 Early development imported and Indian coal in the ratio of 40:60 Supercritical TOR 6 Oct 2010 at http://bit.ly/1joFYuG 15.808028 80.397348 approximate Kanuparthi Naguluppalapadu Prakasan
Vadarevu Ultra Mega Power Project Stages II-III Vadarevu Ultra Mega Power Project Andhra Pradesh Power Generation Corporation (APGENCO) 2400 Planning Supercritical TOR 6 Oct 2010 at http://bit.ly/1joFYuG 15.808028 80.397348 approximate Kanuparthi Naguluppalapadu Prakasan
VBF Ferro Alloys Bodepalli plant VBF Ferro Alloys Bodepalli plant VBC Ferro Alloys 120 Planning 18.242513 83.348215 approximate Bodepalli Armoor Nizamabad
Vemavaram power station Vemavaram power station SNN Infra Power Projects, Duckjin Global Investment (for Korean South Eastern Power) 1320 Announced 70% indigenous, 30% imported Supercritical Proposal for TOR 8 May 2013 at http://bit.ly/1eLuQ7C; Exec summary at http://bit.ly/1eLvJwW; 16.3174751 81.0962516 approximate Vemavaram Thondangi East Godavari
Vijayawada Thermal Power Station (IGCC) Vijayawada Thermal Power Station (IGCC) Dr. Narla Tata Rao or Dr. NTTTPS Andhra Pradesh Power Generation Corporation (APGENCO) 182 Early development IGCC 16.5973 80.5382 exact Ibrahimpatnam Krishna
Vijayawada Thermal Power Station expansion Vijayawada Thermal Power Station Dr. Narla Tata Rao or Dr. NTTTPS Andhra Pradesh Power Generation Corporation (APGENCO) 800 Planning Supercritical TOR 26 Sep 2012 at http://bit.ly/1eLyLBi and 16.5973 80.5382 exact Ibrahimpatnam Krishna
Vikas Power thermal plant Vikas Power thermal plant Vikas Power Meenakshi Group 540 Planning 14.288601 80.124848 approximate Krishnapatnam Nellore
Vizag Thermal Power Plant Vizag Thermal Power Plant Hinduja National Power Corporation 520 Construction 2014 EC 3 Mar 2009 at http://bit.ly/1kp4iNc 17.5636425 83.1388772 exact Palavalasa Visakhapatnam
Vizag Thermal Power Plant Vizag Thermal Power Plant Hinduja National Power Corporation 520 Construction 2014 EC 3 Mar 2009 at http://bit.ly/1kp4iNc 17.5636425 83.1388772 exact Palavalasa Visakhapatnam
West Godavari Super Thermal Power Station West Godavari Super Thermal Power Station Yeswanth Industrial Infrastructure Projects 3960 Early development Supercritical TOR 30 Mar 2011 at http://bit.ly/1joFmVL 17.4096508 82.7147877 approximate Vempadu, Nellipudi, Kagitha and DL Puram Nakkapalli Visakhapatnam

Pages in category "Proposed coal plants in Andhra Pradesh"

The following 67 pages are in this category, out of 67 total.

A

B

D

G

H

J

K

K cont.

L

M

N

O

P

R

S

S cont.

T

U

V

W