Proposed coal plants in India

From SourceWatch
Jump to: navigation, search

This article is part of the Coal Issues portal on SourceWatch, a project of CoalSwarm and the Center for Media and Democracy. See here for help on adding material to CoalSwarm.

This article is part of the CoalSwarm coverage of India and coal.
Sub-articles:
Related articles:
This article is part of the CoalSwarm coverage of proposed coal plants worldwide.
Sub-articles:

For state-by-state maps, tables, and overviews, see:

Loading map...

Note: To see a larger Google map showing the 500+ projects listed on this page, click here.

Background

India is in the midst of a rapid expansion in coal-fired power plant capacity. According to an August 2011 study by Prayas Energy Group, 590,000 megawatts (MW) of projects have received or are expected to receive environmental clearance.[1] The table below provides information on 554 proposed projects representing 617,399 MW of capacity and an estimated 3.7 billion tons of annual carbon dioxide emissions. For information on individual plants, click on the map or on the name of the plant in the sortable table below. For information on mining, power sector companies, financing, environmental impacts, citizen opposition, and other coal-related topics, see India and coal.

Proposed coal-fired power plants

Columns may be sorted by clicking on the headers.

State Plant Company MW Annual CO2 (tons) Type Status Year
Andhra Pradesh Adilabad Power Station Unit 1 Singareni Collieries 600 3,548,220 Advanced development
Andhra Pradesh Adilabad Power Station Unit 2 Singareni Collieries 600 3,548,220 Early development
Andhra Pradesh Adilibad power station (Shalivahana Power Corp.) Shalivahana Power Corp. 300 1,774,110 Uncertain
Andhra Pradesh Ankulapatur power station phase 1 VSF Projects 350 2,069,795 Supercritical Construction
Andhra Pradesh Ankulapatur power station phase 2 VSF Projects 135 798,350 Supercritical Planning
Andhra Pradesh Bhavanapadu Thermal Power Project (Kakarapalle) East Coast Energy 2640 15,612,170 Supercritical Deferred
Andhra Pradesh Bhavavipuram Cement power station Deccan Cements 18 106,447 Construction
Andhra Pradesh Budele power station Indu Projects Limited 1000 5,913,701 Unconfirmed
Andhra Pradesh Damodaram Sanjeevaiah Thermal Power Station (Krishnapatnam) Andhra Pradesh Power Generation Corporation (APGENCO) 1600 9,461,921 Supercritical Construction
Andhra Pradesh Damodaram Sanjeevaiah Thermal Power Station (Krishnapatnam) expansion Andhra Pradesh Power Generation Corporation (APGENCO) 2400 14,192,911 Supercritical Cancelled
Andhra Pradesh Dharmavaram power station Nava Bharat Ventures Ltd 150 887,055 Deferred
Andhra Pradesh Dr. RKP Power Ankulapatur power station phases 1 and 2 Dr. RKP Power 430 2,542,891 Advanced development
Andhra Pradesh Garividi power station Facor Power 45 266,117 Construction
Andhra Pradesh Gopuvanipalam Mega Thermal Power Project (Chinnapuram, Machilipatnam) Nagarjuna Construction Company 1980 11,709,128 Supercritical Unconfirmed
Andhra Pradesh Gudur Thermal Power Project (Momidi) Phases I and II Pragdisa Power Private Ltd 2640 15,612,170 Supercritical Planning
Andhra Pradesh Gunipudi power station (NBPL proposal) Namratha Bizili Private Limited 300 1,774,110 Deferred
Andhra Pradesh Gunipudi power station (STEAPL proposal) Suryachakra Group 1320 7,806,085 Ultra Supercritical Advanced development
Andhra Pradesh Hindupur power station Sheshadri Power & Infrastructure 1320 7,806,085 Unconfirmed
Andhra Pradesh Jaipur power station Singareni Collieries 600 3,548,220 Construction
Andhra Pradesh Jharapudi power station Suryachakra Group 140 827,918 Unconfirmed
Andhra Pradesh Kakatiya Thermal Power Project Stage-II Andhra Pradesh Power Generation Corporation (APGENCO) 600 3,548,220 Construction
Andhra Pradesh Kineta Power Stage I (Krishnapatnam) Kineta Power Limited 1320 7,806,085 Supercritical Advanced development
Andhra Pradesh Kineta Power Stage II (Krishnapatnam) Kineta Power Limited 660 3,903,043 Supercritical Planning
Andhra Pradesh Komarada power station Alfa Infraprop Pvt. Ltd. 2640 15,612,170 Supercritical Planning
Andhra Pradesh Kotapally power station (SKIL Group) SKIL Group 600 3,548,220 Unconfirmed
Andhra Pradesh Kothagudem Phase V Unit 10, Phase VI Unit 11 Andhra Pradesh Power Generation Corporation (APGENCO) 1000 5,913,701 Newly commissioned 2011
Andhra Pradesh Kothagudem TPS expansion Andhra Pradesh Power Generation Corporation (APGENCO) 800 4,730,961 Planning
Andhra Pradesh Krishnapatnam Navayuga thermal station Phase I Navayuga Power 1320 7,806,085 Supercritical Advanced development
Andhra Pradesh Krishnapatnam Navayuga thermal station Phase II Navayuga Power 660 3,903,043 Supercritical Planning
Andhra Pradesh Krishnapatnam Ultra Mega Power Project 1-6 Reliance Power 3960 23,418,255 Deferred
Andhra Pradesh Latchayapeta power station NCS Sugars Ltd. 600 3,548,220 Planning
Andhra Pradesh Lovapalem power station My Home Power Ltd. 1000 5,913,701 Unconfirmed
Andhra Pradesh Meenakshi Energy Thermal Power Project Phase-I Unit 1 Meenakshi Energy 150 887,055 Newly commissioned 2012
Andhra Pradesh Meenakshi Energy Thermal Power Project Phase-I Unit 2 Meenakshi Energy 150 887,055 Newly commissioned 2013
Andhra Pradesh Meenakshi Energy Thermal Power Project Phase-II Meenakshi Energy 600 3,548,220 Uncertain
Andhra Pradesh Meghavaram Kakarapalli power station Meghavaram Power 450 2,661,165 Deferred
Andhra Pradesh Muthukur Mandal power station (Painampuram) Nelcast Energy Corporation Ltd 1320 7,806,085 Supercritical Early development
Andhra Pradesh Nagarjuna Construction Company Sompeta Thermal Plant Nagarjuna Construction Company 2640 15,612,170 Deferred
Andhra Pradesh NCC Vamsadhara Mega Power Project Nagarjuna Construction Company 1960 11,590,854 Unconfirmed
Andhra Pradesh Ontimavadi power station GMR Energy 6300 37,256,315 Planning
Andhra Pradesh Paloncha power station expansion #1 Nava Bharat Ventures Ltd 150 887,055 Construction
Andhra Pradesh Paloncha power station expansion #2 Nava Bharat Ventures Ltd 150 887,055 Planning
Andhra Pradesh Pegadapalli (Jaipur Mandal) power station Singareni Collieries 600 3,548,220 Construction
Andhra Pradesh Pentakota power station Namratha Bizili Private Limited 150 887,055 Deferred
Andhra Pradesh Pentakota power station (Srinivasam Energy) Srinivasam Energy Limited 1320 7,806,085 Supercritical Unconfirmed
Andhra Pradesh Pudimadaka Ultra Mega Power Project NTPC 4000 23,654,803 Supercritical Advanced development
Andhra Pradesh Pynampuram Thermal Power Project Units 1 and 2 Thermal Powertech Corporation 1320 7,806,085 Supercritical Advanced development
Andhra Pradesh Ramagundam Stage-IV NTPC 1000 5,913,701 Early development
Andhra Pradesh Rayalaseema Thermal Power Project Stage-III (Unit 5) Andhra Pradesh Power Generation Corporation (APGENCO) 210 1,241,877 Newly commissioned 2010
Andhra Pradesh Rayalaseema Thermal Power Project Stage-IV (Unit 6) Andhra Pradesh Power Generation Corporation (APGENCO) 600 3,548,220 Construction
Andhra Pradesh Saggonda power station Andhra Sugars 120 709,644 Planning
Andhra Pradesh Sattupally Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 600 3,548,220 Early development
Andhra Pradesh Sigma Infrarop power station (Khamman) Sigma Infrarop Ltd 2640 15,612,170 Unconfirmed
Andhra Pradesh Simhadri power station Unit 3 NTPC 500 2,956,850 Newly commissioned 2011
Andhra Pradesh Simhadri power station Unit 4 NTPC 500 2,956,850 Newly commissioned 2012
Andhra Pradesh Sompeta power station (Suryachakra) Suryachakra Group 1200 7,096,441 Unconfirmed
Andhra Pradesh Sree Siva Satyadeva Power Plant Sree Siva Satyadeva Power Plant Pvt. 2000 11,827,402 Cancelled
Andhra Pradesh Sri Damodaram Sanjeevaiah (Krishnapatnam) Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 1600 9,461,921 Construction
Andhra Pradesh Srikakulam Thermal Power Station Andhra Pradesh Power Generation Corporation (APGENCO) 2400 14,192,882 Early development
Andhra Pradesh Thamminapatnam power station (Simhapuri) Phase I Units 1 and 2 Simhapuri Energy 300 1,774,110 Subcritical Newly commissioned 2012
Andhra Pradesh Thamminapatnam power station (Simhapuri) Phase-II Simhapuri Energy 300 1,774,110 Subcritical Construction
Andhra Pradesh Thamminapatnam power station (Simhapuri) Phase-III Simhapuri Energy 1320 7,806,085 Supercritical Advanced development
Andhra Pradesh Uppada power station Spectrum Power Generation 1320 7,806,085 Cancelled
Andhra Pradesh Vadarevu Ultra Mega Power Project Stages II-III Andhra Pradesh Power Generation Corporation (APGENCO) 2400 14,192,882 Planning
Andhra Pradesh Varadevu Ultra Mega Power Project Stage I Andhra Pradesh Power Generation Corporation (APGENCO) 1600 9,461,921 Early development
Andhra Pradesh VBF Ferro Alloys Bodepalli plant VBC Ferro Alloys 120 709,644 Planning
Andhra Pradesh Vijayawada Thermal Power Station (IGCC) Andhra Pradesh Power Generation Corporation (APGENCO) 182 1,076,294 IGCC Early development
Andhra Pradesh Vijayawada Thermal Power Station expansion Andhra Pradesh Power Generation Corporation (APGENCO) 800 4,730,961 Planning
Andhra Pradesh Vikas Power thermal plant Vikas Power 540 3,193,398 Planning
Andhra Pradesh Vizag Thermal Power Plant Hinduja National Power Corporation 1040 6,150,249 Construction
Andhra Pradesh Welspun Andhra Pradesh project Welspun Energy 1320 7,806,085 Supercritical Early development
Assam Bongaigaon power station Stage I NTPC 750 4,435,276 Construction
Assam Bongaigaon power station Stage II NTPC 250 1,478,425 Planning
Assam Borgolai power station Assam Power Projects Development Company Ltd 250 1,478,425 Planning
Assam Margherita power station NEEPCO and APGCL 480 2,838,576 Planning
Assam Naitor power station Globe Power & Steel 1320 7,806,085 Supercritical Planning
Bihar Banka Power Project Abhijeet Group 3960 23,418,255 Supercritical Uncertain
Bihar Barauni power station expansion Bihar State Electricity Board 500 2,956,850 Early development
Bihar Barh I power station NTPC 1980 11,709,128 Construction
Bihar Barh II power station, Unit 1 NTPC 660 3,903,043 Supercritical Newly commissioned 2013
Bihar Barh II power station, Unit 2 NTPC 660 3,903,043 Construction
Bihar Bhagalpur Power Project Ganga Power & Natural Resources 2640 15,612,170 Early development
Bihar Buxar Thermal Power Station (Chausa) Buxar Bijlee Company 1320 7,806,085 Early development
Bihar Indragacchi power station India Power Corporation 1320 7,806,085 Supercritical Early development
Bihar Jagdishpur power station Stage 1 AES India 1320 7,806,085 Early development
Bihar Jagdishpur power station Stage 2 AES India 1320 7,806,085 Planning
Bihar Kahalgaon power station (Cement Manufacturing Co.) Cement Manufacturing Company Ltd. 500 2,956,850 Cancelled
Bihar Kahalgaon power station (East-West Power) East-West Power Generation Co. Ltd. 1000 5,913,701 Cancelled
Bihar Kahalgaon power station (Sarvottam) Sarvottam Infrastructure 540 3,193,398 Cancelled
Bihar Kahalgaon Super Thermal Power Plant St-III Extension NTPC 500 2,956,850 Planning
Bihar Kiul Thermal Power Project (Lakhisarai) Mirach Power Pvt. Ltd 1320 7,806,085 Planning
Bihar Kochar power station Triton Energy Ltd. 1320 7,806,085 Planning
Bihar Lakhisarai power station (SPML) SPML 1200 7,096,441 Planning
Bihar Lakhisarai Thermal Power Station (Kajara) Lakhisarai Bijlee 1320 7,806,085 Advanced development
Bihar Meherpur power station Usha Martin 1200 7,096,441 Uncertain
Bihar Muzaffarpur power station extension Kanti Bijlee Utpadan Nigam 390 2,306,343 Construction
Bihar Nabinagar (Majhiyan) Super Thermal Power Project Nabinagar Power Generating Company 1980 11,709,128 Supercritical Advanced development
Bihar Nabinagar Thermal Power Project NTPC and Ministry of Railways 1000 5,913,701 Construction
Bihar Pirpainti power station (CESC) CESC 2000 11,827,402 Early development
Bihar Pirpainti power station (Essar) Essar Energy 1800 10,644,661 Deferred
Bihar Pirpainti Thermal Power Station Pirpainti Bijlee Company 1320 7,806,085 Early development
Bihar Prabhawati Nagar power station Arrissan Power Limited 1320 7,806,085 Early development
Bihar Sirdala power station Global Powmin 2640 15,612,170 Early development
Chhattisgarh Akaltara Ultra Mega Power Project Akaltara Power 4000 23,654,803 Cancelled
Chhattisgarh Amarkantak Thermal Power Project phase I (Pathadi) unit 2 Lanco 300 1,774,110 Newly commissioned 2010
Chhattisgarh Amarkantak Thermal Power Project phase II (Pathadi) units 3 and 4 Lanco 1320 7,806,085 Supercritical Construction
Chhattisgarh Amoda power station DCM Shriram Consolidated 600 3,548,220 Early development
Chhattisgarh Arasmeta Expansion Power Plant KSK Energy Ventures 43 254,289 Construction
Chhattisgarh Athena Chhattisgarh power station Athena Chhattisgarh Power Limited 1200 7,096,441 Construction
Chhattisgarh Avantha Bhandar power station Unit 1 Avantha Power and Infrastructure 600 3,548,220 Newly commissioned 2013
Chhattisgarh Avantha Bhandar power station Unit 2 Avantha Power and Infrastructure 600 3,548,220 Early development
Chhattisgarh BALCO Korba power station expansion Bharat Aluminium Company 1200 7,096,441 Construction
Chhattisgarh Balpur power station Jain Energy 1200 7,096,441 Early development
Chhattisgarh Baradarha power station DB Power 1200 7,096,441 Construction
Chhattisgarh Bhaiso power station (Janjgir-Champa) Phase 1 KVK Power & Infrastructure Pvt. Ltd. 600 3,548,220 Early development
Chhattisgarh Bhaiso power station (Janjgir-Champa) Phase 2 KVK Power & Infrastructure Pvt. Ltd. 600 3,548,220 Planning
Chhattisgarh Bhaiyathan Thermal Power Project Indiabulls Power and Chhattisgarh State Power Generation Company 1320 7,806,085 Early development
Chhattisgarh Bhandhakhar power station Maruti Clean Coal and Power 300 1,774,110 Advanced development
Chhattisgarh Bhengari power station Mahavir Global Coal Limited (MGCL) 540 3,193,398 Planning
Chhattisgarh Bhushan Steel Chhattisgarh project Bhushan Steel 1000 5,913,701 Planning
Chhattisgarh Binjkote power station SKS Ispat and Power 1200 7,096,441 Construction
Chhattisgarh Birra Thermal Power Project Moser Baer Power & Infrastructures 1320 7,806,085 Early development
Chhattisgarh BLA Chhattisgarh power station BLA Power 540 3,193,398 Cancelled
Chhattisgarh Bunji Bundeli Thermal Power Project Chhattisgarh State Power Generation Company 500 2,956,850 Early development
Chhattisgarh Chakabura power station expansion unit 1 ACB (India) 135 798,350 Subcritical Newly commissioned 2011
Chhattisgarh Chakabura power station expansion unit 2 ACB (India) 135 798,350 Subcritical Construction
Chhattisgarh Champa Adhunik power station Adhunik Power and Natural Resources 1320 7,806,085 Planning
Chhattisgarh Champa Power Project ACB (India) 1200 7,096,441 Early development
Chhattisgarh Chandan Nagar power station IFFCO Chhattisgarh Power 1000 5,913,701 Planning
Chhattisgarh Chhattisgarh GMR power station Phase I GMR Energy 1370 8,101,770 Advanced development
Chhattisgarh Chhattisgarh GMR power station Phase II GMR Energy 685 4,050,885 Early development
Chhattisgarh Dhardai power station JSW ISPAT Steel 1200 7,096,441 Unconfirmed
Chhattisgarh Facor Power Chhattisgarh power project Facor Power 600 3,548,220 Supercritical Early development
Chhattisgarh Godhna power station Karnataka Power Corporation 1600 9,461,921 Planning
Chhattisgarh Gorra Thermal Power Plant Patni Power Projects 540 3,193,398 Planning
Chhattisgarh IFFCO-CSPGCL Thermal Power Project Chhattisgarh State Power Generation Company 1320 7,806,085 Early development
Chhattisgarh Janjgir power station Karnataka Power Corporation 1200 7,096,441 Planning
Chhattisgarh Kasaipalli power station Unit 1 Aryan Coal Benefications 135 798,350 Newly commissioned 2011
Chhattisgarh Kasaipalli power station Unit 2 Aryan Coal Benefications 135 798,350 Newly commissioned 2012
Chhattisgarh Khamhar power station AES Chhattisgarh Energy 1440 8,515,729 Planning
Chhattisgarh Korba III power station NTPC 500 2,956,850 Newly commissioned 2010
Chhattisgarh Korba South Thermal Power Project Unit 1 and Unit 2 Chhattisgarh State Power Generation Company 1000 5,913,701 Early development
Chhattisgarh Korba West (Hasdeo Thermal Power Station) Extension Chhattisgarh State Power Generation Company 500 2,956,850 Newly commissioned 2013
Chhattisgarh KSK Mahanadi Power Project Units 1-4 KSK Energy Ventures 2400 14,192,882 Construction
Chhattisgarh KSK Mahanadi Power Project Units 5-6 KSK Energy Ventures 1200 7,096,441 Planning
Chhattisgarh KSK Narmada Power Project KSK Energy Ventures 1800 10,644,661 Early development
Chhattisgarh Kukurda power station JSW Energy 1320 7,806,085 Supercritical Early development
Chhattisgarh Kukurda power station JSW Energy 1320 7,806,085 Supercritical Advanced development
Chhattisgarh Lanco Chhattisgarh Thermal Power Project Lanco 2000 11,827,402 Planning
Chhattisgarh Lara Integrated Thermal Power Project 1-2 NTPC 1600 9,461,921 Supercritical Advanced development
Chhattisgarh Lara Integrated Thermal Power Project 3-4 NTPC 1600 9,461,921 Supercritical Planning
Chhattisgarh Lara Integrated Thermal Power Project 5 NTPC 800 4,730,961 Supercritical Planning
Chhattisgarh Marwa power station Chhattisgarh State Power Generation Company 1000 5,913,701 Construction
Chhattisgarh Moser Baer Captive Power Project Moser Baer Power & Infrastructures and PTC India 150 887,055 Early development
Chhattisgarh Pathadi power station Lanco and KVK 1320 7,806,085 Construction
Chhattisgarh Raigarh Power Project (TRN/ACB) ACB (India) 600 3,548,220 Advanced development
Chhattisgarh Raigarh Project (Jindal) Jindal Power 1320 7,806,085 Supercritical Advanced development
Chhattisgarh Raigarh project (VISA Power) VISA Power 1200 7,096,441 Advanced development
Chhattisgarh Raikheda power station GMR Energy 1370 8,101,770 Supercritical Construction
Chhattisgarh Ratija Power Project Phase I ACB (India) 50 295,685 Subcritical Newly commissioned 2013
Chhattisgarh Ratija Power Project Phase II ACB (India) 50 295,685 Subcritical Early development
Chhattisgarh Sapnai power station Topworth Energy 1260 7,451,263 Early development
Chhattisgarh Sapos power station (BEC Power) BEC Power 500 2,956,850 Early development
Chhattisgarh Sapos power station (Suryachakra) Suryachakra Group 1320 7,806,085 Ultra Supercritical Advanced development
Chhattisgarh Sipat I power station expansion, units 1 and 2 NTPC 1320 7,806,085 Supercritical Newly commissioned 2011
Chhattisgarh Sipat I power station expansion, unit 3 NTPC 660 3,903,043 Newly commissioned 2012
Chhattisgarh Surguja Ultra Mega Power Project not selected 4000 23,654,803 Cancelled
Chhattisgarh SV Power project (Renki) phase II KVK 300 1,774,110 Early development
Chhattisgarh Tamnar II Project Jindal Power 2400 14,192,882 Subcritical Construction
Chhattisgarh Uchpinda power station RKM Powergen Private Limited 1440 8,515,729 Construction
Gujarat Akrimota Power Project expansion Gujarat Mineral Development Corporation 250 1,478,425 Unconfirmed
Gujarat Amreli power station Avantha Power and Infrastructure 1320 7,806,085 Supercritical Planning
Gujarat Bhadreshwar power station (OPG) OPG Power Ventures 300 1,774,110 Deferred
Gujarat Bhadreshwar Thermal Power Project (Adani) Adani Power 3300 19,515,213 Planning
Gujarat Bharuch DCM power station DCM Shriram Consolidated 48 283,858 Planning
Gujarat Bhavnagar power station Gujarat Power Corporation 500 2,956,850 Construction
Gujarat Bherai power station VISA Power 1320 7,806,085 Early development
Gujarat Dahej power station (JSW Energy) JSW Energy 2400 14,192,882 Planning
Gujarat Dahej Thermal Power Project Adani Power 2640 15,612,170 Deferred
Gujarat Dholera Power Plant Gujarat State Electricity Corp 1600 9,461,921 Planning
Gujarat Dhuvaran Super Thermal Power Project NTPC 1320 7,806,085 Planning
Gujarat Gujarat Power Project (Valia) Neyveli Lignite Corporation 500 2,956,850 Planning
Gujarat Hazira II power plant Essar Energy 270 1,596,699 Construction
Gujarat Jamnagar Complex power station Reliance Industries 1000 5,913,701 Planning
Gujarat Mundra Thermal Power Project (Adani) Phase I Unit 1 Adani Power 330 1,951,521 Subcritical Newly commissioned 2009
Gujarat Mundra Thermal Power Project (Adani) Phase I Units 2-4 Adani Power 990 5,854,564 Subcritical Newly commissioned 2010
Gujarat Mundra Thermal Power Project (Adani) Phase I Unit 5 Adani Power 660 3,903,043 Supercritical Newly commissioned 2010
Gujarat Mundra Thermal Power Project (Adani) Phase I Units 6 and 7 Adani Power 1320 7,806,085 Supercritical Newly commissioned 2011
Gujarat Mundra Thermal Power Project (Adani) Phase I Units 8 and 9 Adani Power 1320 7,806,085 Supercritical Newly commissioned 2012
Gujarat Okha power station SPR Infrastructure India 2640 15,612,170 Supercritical Early development
Gujarat Pipavav power station Torrent Power and Gujarat Power Corporation 2000 11,827,402 Early development
Gujarat Salaya I power plant Essar Energy 1200 7,096,441 Subcritical Newly commissioned 2012
Gujarat Salaya II power plant Essar Energy 1320 7,806,085 Supercritical Construction
Gujarat Salaya III power plant Essar Energy 600 3,548,220 Circulating Fluidized Bed Construction
Gujarat Sikka Thermal Power Station Units 3-4 Gujarat State Electricity Corp 500 2,956,850 Construction
Gujarat Simar power station JSW Energy 1600 9,461,921 Cancelled
Gujarat Surat Lignite Ext Units 3-4 Gujarat Industries 250 1,478,425 Newly commissioned 2011
Gujarat Suryachakra captive power plant Suryachakra Group 200 1,182,740 Early development
Gujarat Tata Mundra Ultra Mega Power Project 1-3 Tata Power 2400 14,192,882 Supercritical Newly commissioned 2012
Gujarat Tata Mundra Ultra Mega Power Project 4 and 5 Tata Power 1600 9,461,921 Supercritical Newly commissioned 2013
Gujarat Ukai Thermal Power Station Unit 6 Gujarat State Electricity Corp 500 2,956,850 Newly commissioned 2013
Gujarat Wanakbori Thermal Power Station Unit 8 Gujarat State Electricity Corp 800 4,730,961 Early development
Haryana Deenbandhu Chhotu Ram Thermal Power Plant expansion Haryana Power Generation Company 660 3,903,043 Supercritical Planning
Haryana Indira Gandhi Super Thermal Power Project Unit 1 NTPC 500 2,956,850 Subcritical Newly commissioned 2010
Haryana Indira Gandhi Super Thermal Power Project Unit 2 NTPC 500 2,956,850 Subcritical Newly commissioned 2011
Haryana Indira Gandhi Super Thermal Power Project Unit 3 NTPC 500 2,956,850 Subcritical Newly commissioned 2012
Haryana Jhajjar (Mahatma Gandhi) power station CLP India 1320 7,806,085 Supercritical Newly commissioned 2012
Haryana Rajiv Gandhi Thermal Power Project Hisar Unit I Haryana Power Generation Company 600 3,548,220 Newly commissioned 2010
Haryana Rajiv Gandhi Thermal Power Project Hisar Unit II Haryana Power Generation Company 600 3,548,220 Newly commissioned 2011
Jharkhand Baranda power station JSW Energy 1620 9,580,195 Early development
Jharkhand Bhagalpur power station Gagan Power & Natural Resources 1320 7,806,085 Early development
Jharkhand Bokaro A Thermal Power Station Damodar Valley Corporation 500 2,956,850 Construction
Jharkhand Bokaro Steel City Thermal Power Station expansion Damodar Valley Corporation 500 2,956,850 Planning
Jharkhand Chandil Singh power station HDIL Energy 1320 7,806,085 Supercritical Unconfirmed
Jharkhand Chandrapura power station Damodar Valley Corporation 500 2,956,850 Newly commissioned 2011
Jharkhand Chandwa Power Project Phase I Abhijeet Group 1080 6,386,797 Subcritical Construction
Jharkhand Chandwa Power Project Phase II Abhijeet Group 675 3,991,748 Early development
Jharkhand Chandwa Power Project Phase III Abhijeet Group 660 3,903,043 Early development
Jharkhand Chichro Patsimal power station NTPC & Coal India 2000 11,827,402 Cancelled
Jharkhand Dumka power station (CESC) Phase I CESC 600 3,548,220 Early development
Jharkhand Dumka power station (CESC) Phase I CESC 660 3,903,043 Planning
Jharkhand Dumka Project Jindal Power 1300 7,687,811 Supercritical Early development
Jharkhand Godda Project Jindal Power 660 3,903,043 Supercritical Advanced development
Jharkhand Gumla power station (Kamdara) Jharkhand State Electricity Board 1320 7,806,085 Early development
Jharkhand Mahadev Prasad Super Thermal Power Station stage I Adhunik Power and Natural Resources 270 1,596,699 Subcritical Newly commissioned 2012
Jharkhand Mahadev Prasad Super Thermal Power Station stage II Adhunik Power and Natural Resources 270 1,596,699 Subcritical Newly commissioned 2013
Jharkhand Mahadev Prasad Super Thermal Power Station stage III Adhunik Power and Natural Resources 540 3,193,398 0 Planning
Jharkhand Jharkhand Aluminium power station Hindalco Industries 900 5,322,331 Early development
Jharkhand Jharkhand Project Jindal Power 2640 15,612,170 Supercritical Planning
Jharkhand Jojobera Power Plant unit 5 Tata Power 120 709,644 Newly commissioned 2011
Jharkhand Kamdara power station Jharkhand State Electricity Board 1320 7,806,085 Construction
Jharkhand Koderma Thermal Power Station Unit 1 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2011
Jharkhand Koderma Thermal Power Station Unit 2 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2013
Jharkhand KVK Jharkhand project KVK Nilachal Power Pvt. Ltd. 1000 5,913,701 Early development
Jharkhand Maithon Right Bank Thermal Power Station Unit 1 Damodar Valley Corporation and Tata Power 525 3,104,693 Subcritical Newly commissioned 2011
Jharkhand Maithon Right Bank Thermal Power Station Unit 2 Damodar Valley Corporation and Tata Power 525 3,104,693 Subcritical Newly commissioned 2012
Jharkhand Maithon Right Bank Thermal Power Station Phase II Damodar Valley Corporation and Tata Power 1600 9,461,921 Subcritical Early development
Jharkhand Malaxmi Mega Thermal Power Project (Thakurbari) Malaxmi 2640 15,612,170 Unconfirmed
Jharkhand Patratu power station (Jinbhuvish Energy) Jinbhuvish Energy (East) 1320 7,806,085 Planning
Jharkhand Rahem power station Gupta Energy 1000 5,913,701 Unconfirmed
Jharkhand Sahibganj power station Madhucon Projects 1320 7,806,085 Early development
Jharkhand Saraikela power station Kohinoor Power 215 1,271,446 Construction
Jharkhand Tilaiya Ultra Mega Power Project 1-5 Reliance Power 3300 19,515,213 Supercritical Early development
Jharkhand Tilaiya Ultra Mega Power Project 6 Reliance Power 660 3,903,043 Supercritical Early development
Jharkhand Tiruldih Power Project Tata Power 1980 11,709,128 Early development
Jharkhand Tori power plant Essar Energy 1200 7,096,441 Construction
Jharkhand Visa Power Jharkhand project VISA Power 2640 15,612,170 Early development
Jharkhand Welspun Energy Parbahal Thermal Power Plant Welspun Energy 1980 11,709,128 0 Early development
Karnataka Bellary Thermal Power Station 2 Karnataka Power Corporation 500 2,956,850 Newly commissioned 2012
Karnataka Bellary Thermal Power Station 3 Karnataka Power Corporation 700 4,139,591 Planning
Karnataka Chamalapura power station Karnataka Power Corporation 1000 5,913,701 Cancelled
Karnataka Edlapura power station Karnataka Power Corporation 800 4,730,961 Supercritical Planning
Karnataka Ghataprabha power station Power Company of Karnataka (PCKL) 1320 7,806,085 Early development
Karnataka Gulbarga power station Power Company of Karnataka (PCKL) 1320 7,806,085 Supercritical Early development
Karnataka Hanakon Thermal Power Project Ind-Barath Power 450 2,661,165 Cancelled
Karnataka Hassan power station Hassan Thermal Power (P) Ltd 1000 5,913,701 Early development
Karnataka Jewargi power station Jewargi Power Pvt Ltd. 1320 7,806,085 Planning
Karnataka JSW Vijayanagar power station expansion JSW Energy 660 3,903,043 Supercritical Advanced development
Karnataka Kadechur power station Atlas Power India 1320 7,806,085 Early development
Karnataka Karnataka Gupta power station Gupta Power 1320 7,806,085 Unconfirmed
Karnataka Kudgi Super Thermal Power Project Stage I NTPC 2400 14,192,882 Supercritical Construction
Karnataka Kudgi Super Thermal Power Project Stage II NTPC 1600 9,461,921 Supercritical Early development
Karnataka Mangoli power station Flamingo Energy Ventures 1320 7,806,085 Supercritical Early development
Karnataka Mulwad power station Luxor Energy 1320 7,806,085 Supercritical Early development
Karnataka Raichur Thermal Power Station Unit 8 Karnataka Power Corporation 250 1,478,425 Subcritical Newly commissioned 2010
Karnataka Tadri Ultra Mega Power Project NTPC 4000 23,654,803 0 Deferred
Karnataka Udupi Power unit 1 Lanco 600 3,548,220 Subcritical Newly commissioned 2010
Karnataka Udupi Power unit 2 Lanco 600 3,548,220 Subcritical Newly commissioned 2011
Karnataka Udupi Power units 3 & 4 Lanco 1320 7,806,085 0 Early development
Karnataka Vadlur power station Surana Power Ltd 420 2,483,754 Advanced development
Karnataka Vantamuri power station Shree Renuka Energy 1050 6,209,386 Early development
Karnataka Yedlapur thermal station Karnataka Power Corporation 850 5,026,646 Supercritical Advanced development
Karnataka Yeramarus thermal station Karnataka Power Corporation 850 5,026,646 Supercritical Advanced development
Kerala Kasargod power station Kerala State Industrial Development Corp. 2520 14,902,526 Supercritical Early development
Madhya Pradesh Anuppur power station (Newzone) New Zone India 1320 7,806,085 Supercritical Early development
Madhya Pradesh Anuppur Thermal Power Project Phase 1 Moser Baer Power & Infrastructures 1200 7,096,441 Subcritical Construction
Madhya Pradesh Anuppur Thermal Power Project Phase 2 Moser Baer Power & Infrastructures 1320 7,806,085 Early development
Madhya Pradesh Banas Thermal Power project (Anuppur) KVK Power & Infrastructure Pvt. Ltd. 1320 7,806,085 Planning
Madhya Pradesh Bansagar power station MPTradco 1600 9,461,921 Supercritical Early development
Madhya Pradesh Barethi Super Thermal Power Project NTPC 3960 23,418,255 Supercritical Early development
Madhya Pradesh Bina Refinery power station Bharat Oman Refinery 99 585,456 Construction
Madhya Pradesh Bina Thermal Power Project additional units Jaiprakash Power Ventures 750 4,435,276 Planning
Madhya Pradesh Bina Thermal Power Project Unit 1 Jaiprakash Power Ventures 250 1,478,425 Newly commissioned 2012
Madhya Pradesh Bina Thermal Power Project Unit 2 Jaiprakash Power Ventures 250 1,478,425 Newly commissioned 2013
Madhya Pradesh Chhindwara JSW power station JSW Energy 1320 7,806,085 Supercritical Cancelled
Madhya Pradesh Chitrangi Power Project Reliance Power 3960 23,418,255 Supercritical Advanced development
Madhya Pradesh Dada Dhuniwale Thermal Power Project M.P. Power Generating Company 1600 9,461,921 Early development
Madhya Pradesh Gadarwara power station (BLA) BLA Power 140 827,918 Subcritical Advanced development
Madhya Pradesh Gadarwara Super Thermal Power Project NTPC 1320 7,806,085 Early development
Madhya Pradesh Jabalpur Thermal Power Project VISA Power 1320 7,806,085 Early development
Madhya Pradesh Jaypee Nigrie Super Thermal Power Project Jaiprakash Power Ventures 1320 7,806,085 Supercritical Construction
Madhya Pradesh Jhabua (Chetak) power station Chetak Enterprises 1320 7,806,085 Deferred
Madhya Pradesh Jhabua Power Seoni power station phase 1 Avantha Power and Infrastructure 600 3,548,220 Subcritical Construction
Madhya Pradesh Jhabua Power Seoni power station phase 2 Avantha Power and Infrastructure 660 3,903,043 Subcritical Advanced development
Madhya Pradesh Katni power station Welspun Energy 1980 11,709,128 Supercritical Advanced development
Madhya Pradesh Khargaone power station NTPC 0 0 Planning
Madhya Pradesh Madhya Pradesh Jain Energy power station (Birhulee) Jain Energy 1320 7,806,085 Early development
Madhya Pradesh Mahan Aluminium power station Hindalco Industries 900 5,322,331 Construction
Madhya Pradesh Mahan I power plant, Unit 1 Essar Energy 600 3,548,220 Subcritical Newly commissioned 2013
Madhya Pradesh Mahan I power plant, Unit 2 Essar Energy 600 3,548,220 Subcritical Construction
Madhya Pradesh Maharjapur power station Sudama Mahavir Power 1320 7,806,085 Supercritical Early development
Madhya Pradesh Mandsaur power station Chetak Enterprises 1320 7,806,085 Deferred
Madhya Pradesh Pench Thermal Power Project Adani Power 1320 7,806,085 Supercritical Deferred
Madhya Pradesh Sasan Ultra Mega Power Project 1 Reliance Power 660 3,903,043 Supercritical Newly commissioned 2013
Madhya Pradesh Sasan Ultra Mega Power Project 2 Reliance Power 660 3,903,043 Supercritical Construction
Madhya Pradesh Sasan Ultra Mega Power Project 3 Reliance Power 660 3,903,043 Supercritical Newly commissioned 2013
Madhya Pradesh Sasan Ultra Mega Power Project 4-5 Reliance Power 1320 7,806,085 Supercritical Construction
Madhya Pradesh Sasan Ultra Mega Power Project 6 Reliance Power 660 3,903,043 Supercritical Construction
Madhya Pradesh Satpura Thermal Power Station Unit 10 M.P. Power Generating Company 250 1,478,425 Newly commissioned 2013
Madhya Pradesh Satpura Thermal Power Station Unit 11 M.P. Power Generating Company 250 1,478,425 Construction
Madhya Pradesh Shahdol power station (formerly SJK Powergen) GMR Energy 1370 8,101,770 Early development
Madhya Pradesh Shahpura power station MP Power Trading Company Limited 1500 8,870,551 Early development
Madhya Pradesh Shree Singaji Thermal Power Project Stage I Unit 1 M.P. Power Generating Company 600 3,548,220 Construction
Madhya Pradesh Shree Singaji Thermal Power Project Stage I Unit 2 M.P. Power Generating Company 600 3,548,220 Construction
Madhya Pradesh Shree Singaji Thermal Power Project Stage II M.P. Power Generating Company 1320 7,806,085 Early development
Madhya Pradesh Sidhi Power Project ACB (India) 1200 7,096,441 Advanced development
Madhya Pradesh Suryachakra Thermal (Madhya Pradesh) Suryachakra Group 1320 7,806,085 Supercritical Deferred
Madhya Pradesh Vindhyachal-IV power station unit 11 NTPC 500 2,956,850 Newly commissioned 2012
Madhya Pradesh Vindhyachal-IV power station units 12 NTPC 500 2,956,850 Newly commissioned 2013
Madhya Pradesh Vindhyachal-V power station NTPC 500 2,956,850 Planning
Madhya Pradesh Welspun Amla power station Welspun Energy 1320 7,806,085 Early development
Madhya Pradesh Welspun Energy Anuppur Thermal Power Plant Welspun Energy 1980 11,709,128 Early development
Madhya Pradesh Welspun Mega Industrial & Energy Park Welspun Energy Park Pvt. Ltd. 5280 31,224,340 Early development
Maharashtra Amravati Thermal Power Project Phase I, Unit 1 Indiabulls Power 270 1,596,699 Newly commissioned 2013
Maharashtra Amravati Thermal Power Project Phase I, Units 2-5 Indiabulls Power 1080 6,386,797 Construction
Maharashtra Amravati Thermal Power Project Phase II Indiabulls Power 1350 7,983,496 Construction
Maharashtra Bela power station Ideal Energy Projects 270 1,596,699 Newly commissioned 2013
Maharashtra Bela power station (Mantri Power) Mantri Power 540 3,193,398 Unconfirmed
Maharashtra Bhadravati power station (Ispat) JSW ISPAT Steel 2000 11,827,402 Planning
Maharashtra Bhadravati power station (MIDC) Maharashtra Industrial Development Corporation 1320 7,806,085 Early development
Maharashtra Bhandewadi power station Nagpur Municipal Corporation 500 2,956,850 Deferred
Maharashtra Bhusawal Thermal Power Station Unit 6 Maharashtra State Power Generation Company 660 3,903,043 Advanced development
Maharashtra Bhusawal Thermal Power Station Units 4-5 Maharashtra State Power Generation Company 1000 5,913,701 Newly commissioned 2011
Maharashtra Bijora power station Jinbhuvish Power Generations 1260 7,451,263 Advanced development
Maharashtra Butibori power station unit 1 Reliance Power 300 1,774,110 Newly commissioned 2012
Maharashtra Butibori power station unit 2 Reliance Power 300 1,774,110 Newly commissioned 2013
Maharashtra Chandrapur CESC power station (Tadali) CESC 600 3,548,220 Construction
Maharashtra Chandrapur Gupta power station stage 2 Gupta Energy 540 3,193,398 Advanced development
Maharashtra Chandrapur Gupta power station stage I Gupta Energy 120 709,644 Construction
Maharashtra Chandrapur Thermal Power Station units 8 and 9 Maharashtra State Power Generation Company 1000 5,913,701 Construction
Maharashtra Coastal Maharashtra Project Phase I Tata Power 1600 9,461,921 Supercritical Deferred
Maharashtra Coastal Maharashtra Project Phase II Tata Power 800 4,730,961 Deferred
Maharashtra Dahanu power station upgrade Reliance Infrastructure Limited 1200 7,096,441 Uncertain
Maharashtra Devgad UMPP NTPC 4000 23,654,803 Uncertain
Maharashtra Dhakore power station Ind-Barath Power 1050 6,209,386 Unconfirmed
Maharashtra Dhariwal power station Haldia Energy 600 3,548,220 Construction
Maharashtra Dhopave coal plant (NTPC) NTPC 1600 9,461,921 Planning
Maharashtra Dhopave Thermal Power Station (Mahagenco) Unit 1-3 Maharashtra State Power Generation Company 1980 11,709,128 Supercritical Deferred
Maharashtra Dhopave Thermal Power Station (Mahagenco) Unit 4 Maharashtra State Power Generation Company 800 4,730,961 Supercritical Cancelled
Maharashtra Dondaicha Thermal Power Station Stage I (Units 1 and 2) Maharashtra State Power Generation Company 1320 7,806,085 Advanced development
Maharashtra Dondaicha Thermal Power Station Stage II (Unit 3-5) Maharashtra State Power Generation Company 1980 11,709,128 Planning
Maharashtra EMCO Energy Warora Power Project EMCO Energy 600 3,548,220 Newly commissioned 2013
Maharashtra Ghugus power station phase I Gupta Coalfields & Washeries 120 709,644 Advanced development
Maharashtra Ghugus power station phase II Gupta Coalfields & Washeries 540 3,193,398 Planning
Maharashtra Girye Ultra Mega Power Project Coastal Maharashtra Power Ltd. 4000 23,654,803 Deferred
Maharashtra GMR Energy coal plant GMR Energy 1800 10,644,661 Unconfirmed
Maharashtra Hari Hareshwar power station (Veshvi and Bankot) Hari Hareshwar Power Company 1600 9,461,921 Planning
Maharashtra Khaperkheda TPS Unit 5 Maharashtra State Power Generation Company 500 2,956,850 Newly commissioned 2011
Maharashtra Khursapar power station Lenexis Energy 1320 7,806,085 Early development
Maharashtra Khutafali (Kolura) power station Jinbhuvish Power Generations 1320 7,806,085 Supercritical Early development
Maharashtra Kinebodi power station Nandlal Enterprises 750 4,435,276 Early development
Maharashtra Koradi Thermal Power Station Units 8-9 Maharashtra State Power Generation Company 1320 7,806,085 Construction
Maharashtra Koradi Thermal Power Station Units 8-9 Maharashtra State Power Generation Company 660 3,903,043 Construction
Maharashtra Lanco Vidarbha Thermal Power Lanco 1320 7,806,085 Supercritical Construction
Maharashtra Latur power station Maharashtra State Power Generation Company 1320 7,806,085 Supercritical Planning
Maharashtra Madhekar power station Patni Energy 405 2,395,049 CFB Unconfirmed
Maharashtra Mauda-I STPP (Nagpur) Unit 1 NTPC 500 2,956,850 Newly commissioned 2012
Maharashtra Mauda-I STPP (Nagpur) Unit 2 NTPC 500 2,956,850 Newly commissioned 2013
Maharashtra Mauda-II STPP (Nagpur) NTPC 1320 7,806,085 Early development
Maharashtra Mendki thermal power project Maharashtra State Power Generation Company 1320 7,806,085 Planning
Maharashtra Nardana power station (Vaghode) Shirpur Power 300 1,774,110 Advanced development
Maharashtra Nasik Thermal Power Project Phase I (Indiabulls) Indiabulls Power 1350 7,983,496 Construction
Maharashtra Nasik Thermal Power Project Phase I (Indiabulls) Indiabulls Power 1350 7,983,496 Advanced development
Maharashtra Nasik Thermal Power Station (Sinnar) expansion Maharashtra State Power Generation Company 1320 7,806,085 Supercritical Early development
Maharashtra Paras power station extension Maharashtra State Power Generation Company 660 3,903,043 Planning
Maharashtra Paras power station unit 4 Maharashtra State Power Generation Company 250 1,478,425 Newly commissioned 2010
Maharashtra Parli Thermal Power Station Unit 7 Maharashtra State Power Generation Company 250 1,478,425 Subcritical Newly commissioned 2010
Maharashtra Parli Thermal Power Station Unit 8 Maharashtra State Power Generation Company 250 1,478,425 Subcritical Construction
Maharashtra Rampur coal plant Finolex 1000 5,913,701 Planning
Maharashtra Ratnagiri Power Plant JSW Energy 1200 7,096,441 Newly commissioned 2011
Maharashtra Ratnagiri Power Plant expansion JSW Energy 3200 18,923,843 Supercritical Deferred
Maharashtra Shahpur Thermal Power Project Reliance Power 1200 7,096,441 Cancelled
Maharashtra Solapur power station NTPC 1320 7,806,085 Supercritical Advanced development
Maharashtra Tiroda Thermal Power Project Phase I Unit 1 Adani Power 660 3,903,043 Supercritical Newly commissioned 2012
Maharashtra Tiroda Thermal Power Project Phase I Unit 2 Adani Power 660 3,903,043 Supercritical Newly commissioned 2013
Maharashtra Tiroda Thermal Power Project Phase II Adani Power 660 3,903,043 Newly commissioned 2013
Maharashtra Tiroda Thermal Power Project Phase III Adani Power 1320 7,806,085 Early development
Maharashtra Waral power station Ind-Barath Power 450 2,661,165 Cancelled
Maharashtra Wardha Warora Power Plant Unit 1-2 KSK Energy Ventures 270 1,596,699 Newly commissioned 2010
Maharashtra Wardha Warora Power Plant Units 3-4 KSK Energy Ventures 270 1,596,699 Newly commissioned 2011
Maharashtra Welspun Maxsteel power station Welspun Energy 330 1,951,521 Early development
Meghalaya Garo Hills power station NEEPCO 500 2,956,850 Early development
Meghalaya West Khasi Hills power station NEEPCO 240 1,419,288 Planning
Orissa Aditya Aluminium power station Hindalco Industries 900 5,322,331 Construction
Orissa Angul I power station (Derang) Unit 1 Jindal India Thermal Power 600 3,548,220 Construction
Orissa Angul I power station (Derang) Unit 2 Jindal India Thermal Power 600 3,548,220 Construction
Orissa Angul I power station (Derang) Unit 3 Jindal India Thermal Power 600 3,548,220 Advanced development
Orissa Angul II power station (Derang) Jindal India Thermal Power 1320 7,806,085 Planning
Orissa Angul Smelter power station units 9 and 10 National Aluminium Company 240 1,419,288 Newly commissioned 2010
Orissa Angul Steel power station Jindal Steel & Power 810 4,790,098 Construction
Orissa Babandh power station Lanco 1320 7,806,085 Supercritical Construction
Orissa Balangir power station Sahara India Power Corporation 1320 7,806,085 Early development
Orissa Baragaon power station Jinbhuvish Power Generations 1320 7,806,085 Early development
Orissa Basundhara power station Mahanadi Coalfields Limited 1600 9,461,921 Supercritical Early development
Orissa Bhadrak Ultra Mega Power Project [[]] 4000 23,654,803 Supercritical Planning
Orissa Bhubaneshwar Jasper power station Bhubaneshwar Power 135 798,350 Planning
Orissa Brahmani power project NTPC & Coal India 2000 11,827,402 Planning
Orissa Choudwar power station Indian Metals & Ferro 120 709,644 Subcritical Advanced development
Orissa Cuttack power station (KVK Nilachal) Phase I KVK 350 2,069,795 Construction
Orissa Cuttack power station (KVK Nilachal) Phase II KVK 700 4,139,591 Planning
Orissa Cuttack power station (VISA Power) VISA Power 1320 7,806,085 Supercritical Planning
Orissa Darlipali Super Thermal Power Station NTPC 1600 9,461,921 Supercritical Advanced development
Orissa Dhenkanal power station CESC 1000 5,913,701 Planning
Orissa Gajmara Super Thermal Power Station NTPC 1600 9,461,921 Advanced development
Orissa Ganjam power station SPR Infrastructure India 2640 15,612,170 Supercritical Early development
Orissa Ghogarpalli Ultra Mega Power Project Power Finance Corporation 4000 23,654,803 Planning
Orissa IB Thermal Power Station expansion Orissa Power Generation Corporation 1320 7,806,085 Advanced development
Orissa Jharsuguda CPP power station Units 8 & 9 Vedanta Resources 270 1,596,699 Newly commissioned 2011
Orissa Jharsuguda Ind-Barath power station Phase I Ind-Barath Power 700 4,139,591 Construction
Orissa Jharsuguda Ind-Barath power station Phase II Ind-Barath Power 660 3,903,043 Supercritical Planning
Orissa Jharsuguda Sterlite power station Units 1-2 Sterlite Energy 1200 7,096,441 Subcritical Newly commissioned 2010
Orissa Jharsuguda Sterlite power station Unit 3 Sterlite Energy 600 3,548,220 Subcritical Newly commissioned 2011
Orissa Jharsuguda Sterlite power station Unit 4 Sterlite Energy 600 3,548,220 Subcritical Newly commissioned 2012
Orissa JR Power Project KSK Energy Ventures 1980 11,709,128 Early development
Orissa Kamalanga power station phase I, Units 1 and 2 GMR Energy 700 4,139,591 Newly commissioned 2013
Orissa Kamalanga power station phase I, Unit 3 GMR Energy 350 2,069,795 Construction
Orissa Kamalanga power station phase II GMR Energy 350 2,069,795 Advanced development
Orissa Kishore Nagar Coal-to-Liquids Project Jindal Steel & Power 1350 7,983,496 Planning
Orissa Malibrahmani power station Monnet Power Company 1050 6,209,386 Subcritical Advanced development
Orissa Naraj Marthapur power project Tata Power 660 3,903,043 Planning
Orissa Navabharat II power station Essar Energy 1200 7,096,441 Planning
Orissa Navabharat power station Essar Energy 1050 6,209,386 Construction
Orissa Neulapoi power station (Dhenkanal) CESC 1200 7,096,441 Early development
Orissa Paradip power plant Essar Energy 120 709,644 Subcritical Construction
Orissa Pitamohul power station Ind-Barath Power 1320 7,806,085 Planning
Orissa Randia power station Facor Power 100 591,370 Subcritical Construction
Orissa Rengali power station Neyveli Lignite Corporation 2000 11,827,402 Planning
Orissa Sakhigopal Ultra Mega Power Project Power Finance Corporation 4000 23,654,803 Planning
Orissa Sri Ramchandrapur power project Dr. RKP Power 120 709,644 Subcritical Planning
Orissa Srirampur Coal-to-Liquids Project Strategic Energy Technology Systems 0 0 Planning
Orissa Sundargarh Ultra Mega Power Project (Lankahuda) NTPC 4000 23,654,803 Planning
Orissa Talabira thermal station Neyveli Lignite Corporation, Mahanadi Coal Fields 2000 11,827,402 Cancelled
Orissa Talcher Super Thermal Power Station second expansion NTPC 1320 7,806,085 Planning
Orissa Talcher Thermal Power Station first expansion NTPC 500 2,956,850 Planning
Orissa Wardha Naini Power Project KSK Energy Ventures 1800 10,644,661 Early development
Punjab Gidderbaha power station Punjab State Electric Board 2640 15,612,170 Deferred
Punjab GNDTP Bathinda Extn. Stage-II Punjab State Electric Board 500 2,956,850 Planning
Punjab Gobindpura power station Indiabulls Power 1320 7,806,085 Planning
Punjab Goindwal Sahib Thermal Power Plant GVK 540 3,193,398 Construction
Punjab Goindwal Sahib Thermal Power Plant expansion GVK 1320 7,806,085 Supercritical Planning
Punjab Guru Hargobind (Lehra Mohabbat) Power Station Stage III Punjab State Electric Board 500 2,956,850 Planning
Punjab Mukerian power station Punjab State Power Corporation 1320 7,806,085 Early development
Punjab Rajpura Thermal Power Project (Nalash) Punjab State Power Corporation 1320 7,806,085 Construction
Punjab Rajpura Thermal Power Project (Nalash) phase II Punjab State Power Corporation 700 4,139,591 Planning
Punjab Ropar thermal plant expansion Punjab State Electric Board 1320 7,806,085 Planning
Punjab Talwandi Sabo Power Project Unit 4 Sterlite Energy 660 3,903,043 Supercritical Cancelled
Punjab Talwandi Sabo Power Project Units 1-3 Sterlite Energy 1980 11,709,128 Supercritical Construction
Rajasthan Banswara Cement power station India Cements 20 118,274 Planning
Rajasthan Banswara Thermal Power Station Rajasthan RV Utpadan Nigam 1320 7,806,085 Supercritical Early development
Rajasthan Barsingsar Thermal Power Project Unit 1 Neyveli Lignite Corporation 125 739,213 Newly commissioned 2010
Rajasthan Barsingsar Thermal Power Project Unit 2 Neyveli Lignite Corporation 125 739,213 Newly commissioned 2011
Rajasthan Bikaner power station OM Metals Infraprojects amd SPML 70 413,959 Early development
Rajasthan Bithnok Thermal Power Project Neyveli Lignite Corporation 250 1,478,425 Advanced development
Rajasthan Chhabra power station Unit 2 Rajasthan RV Utpadan Nigam 250 1,478,425 Newly commissioned 2010
Rajasthan Chhabra power station Unit 3 Rajasthan RV Utpadan Nigam 250 1,478,425 Newly commissioned 2013
Rajasthan Chhabra power station Unit 4 Rajasthan RV Utpadan Nigam 250 1,478,425 Construction
Rajasthan Chhabra power station Unit 5-6 expansion Rajasthan RV Utpadan Nigam 1320 7,806,085 Supercritical Early development
Rajasthan JSW Barmer (Jalipa Kapurdi) power station unit 2 JSW Energy 135 798,350 Subcritical Newly commissioned 2010
Rajasthan JSW Barmer (Jalipa Kapurdi) power station units 3-4 JSW Energy 270 1,596,699 Subcritical Newly commissioned 2011
Rajasthan JSW Barmer (Jalipa Kapurdi) power station units 5-8 JSW Energy 540 3,193,398 Newly commissioned 2013
Rajasthan JSW Barmer (Jalipa Kapurdi) power station units 9-10 JSW Energy 270 1,596,699 Early development
Rajasthan Kalisindh Thermal Power Station, Stage I Unit 1 Rajasthan RV Utpadan Nigam 600 3,548,220 Supercritical Construction
Rajasthan Kalisindh Thermal Power Station, Stage I Unit 2 Rajasthan RV Utpadan Nigam 600 3,548,220 Supercritical Construction
Rajasthan Kalisindh Thermal Power Station Stage II Rajasthan RV Utpadan Nigam 1320 7,806,085 Supercritical Planning
Rajasthan Kawai Thermal Power Project Adani Power 1320 7,806,085 Supercritical Construction
Rajasthan Suratgarh Super Thermal Power Station Unit 7-8 Rajasthan RV Utpadan Nigam 1320 7,806,085 Early development
Rajasthan Suratgarh Super Thermal Power Station Unit 9-10 Rajasthan RV Utpadan Nigam 1320 7,806,085 Supercritical Early development
Rajasthan VS Lignite Plant KSK Energy Ventures 135 798,350 Subcritical Newly commissioned 2010
Tamil Nadu Chennai power station I OPG Power Ventures 77 455,355 Subcritical Newly commissioned 2010
Tamil Nadu Chennai power station II OPG Power Ventures 77 455,355 Subcritical Newly commissioned 2012
Tamil Nadu Chennai power station III OPG Power Ventures 80 473,096 Subcritical Newly commissioned 2013
Tamil Nadu Chennai power station IV OPG Power Ventures 160 946,192 Subcritical Construction
Tamil Nadu Cheyyur Ultra Mega Power Project Coastal Tamil Nadu Power 4000 23,654,803 Planning
Tamil Nadu Cuddalore power station Cuddalore Powergen Corporation 1320 7,806,085 Deferred
Tamil Nadu Cuddalore SRM power station SRM Energy 1980 11,709,128 Supercritical Planning
Tamil Nadu Ennore SEZ Super Critical Thermal Power Project (Vayalur) Tamil Nadu Generation and Distribution Corporation 1600 9,461,921 Supercritical Planning
Tamil Nadu Ennore Thermal Power Station expansion Tamil Nadu Generation and Distribution Corporation 1200 7,096,441 Planning
Tamil Nadu Jayamkondam power station Neyveli Lignite Corporation 1600 9,461,921 Planning
Tamil Nadu Marakkanam Super Thermal Power Project NTPC 4000 23,654,803 Planning
Tamil Nadu Mettur Thermal Power Station Stage III TANGEDCO 600 3,548,220 Newly commissioned 2012
Tamil Nadu Nagai Power project (Nagapattinam) KVK Energy 300 1,774,110 Planning
Tamil Nadu New Neyveli Thermal Power Station Neyveli Lignite Corporation 1000 5,913,701 Planning
Tamil Nadu Neyveli TPS-II Expansion unit 1 Neyveli Lignite Corporation 250 1,478,425 Circulating Fluidized Bed Newly commissioned 2012
Tamil Nadu Neyveli TPS-II Expansion unit 2 Neyveli Lignite Corporation 250 1,478,425 Circulating Fluidized Bed Construction
Tamil Nadu North Chennai Thermal Power Station - Stage-II Units 1 and 2 Tamil Nadu Generation and Distribution Corporation 1200 7,096,441 Subcritical Newly commissioned 2013
Tamil Nadu Savarimangalam power station SPR Infrastructure India 2640 15,612,170 Early development
Tamil Nadu Thoothukudi power station (IBPGL) Ind-Barath Power 126 745,126 Newly commissioned 2010
Tamil Nadu Thoothukudi power station (IBPGL) expansion Ind-Barath Power 63 372,563 Planning
Tamil Nadu Thoothukudi power station (IBTPL Hanakon replacement), Unit 1 Ind-Barath Power 150 887,055 Newly commissioned 2013
Tamil Nadu Thoothukudi power station (IBTPL Hanakon replacement), Units 2 and 3 Ind-Barath Power 300 1,774,110 Construction
Tamil Nadu Tirunelveli power station India Cements 50 295,685 Planning
Tamil Nadu Melamaruthur Power Station Phase I Coastal Energen 1200 7,096,441 Subcritical Construction
Tamil Nadu Melamaruthur Power Station Phases II and III Coastal Energen 1600 9,461,921 Supercritical Planning
Tamil Nadu Tuticorin power station (Ind-Barath) Phase I Ind-Barath Power 660 3,903,043 Supercritical Construction
Tamil Nadu Tuticorin power station (Ind-Barath) Phase II Ind-Barath Power 660 3,903,043 Supercritical Planning
Tamil Nadu Tuticorin Thermal Power Project Tamil Nadu Generation and Distribution Corporation and Neyveli Lignite Corp 1000 5,913,701 Construction
Tamil Nadu Udangudi power station Tamil Nadu Generation and Distribution Corporation and Bharat Heavy Electricals Limited 1600 9,461,921 Supercritical Advanced development
Tamil Nadu Uppur power station (Thiruvadanai) Tamil Nadu Generation and Distribution Corporation 1600 9,461,921 Supercritical Early development
Tamil Nadu Vallur Thermal Power Plant Unit 1 NTPC and Tamil Nadu Generation and Distribution Corporation 500 2,956,850 Newly commissioned 2012
Tamil Nadu Vallur Thermal Power Plant Unit 2 NTPC and Tamil Nadu Generation and Distribution Corporation 500 2,956,850 Newly commissioned 2013
Tamil Nadu Vallur Thermal Power Plant Unit 3 NTPC and Tamil Nadu Generation and Distribution Corporation 500 2,956,850 Construction
Uttar Pradesh Amauli Fatehpur power station Uttar Pradesh Power Corporation and Neyveli Lignite Corporation 1980 11,709,128 Construction
Uttar Pradesh Anpara-C power station Lanco 1200 7,096,441 Subcritical Newly commissioned 2011
Uttar Pradesh Anpara-D power station Unit I UP Rajya Vidyut Nigam Ltd 500 2,956,850 Construction
Uttar Pradesh Anpara-D power station Unit II UP Rajya Vidyut Nigam Ltd 500 2,956,850 Construction
Uttar Pradesh Anpara-E power station UP Rajya Vidyut Nigam Ltd 1320 7,806,085 Planning
Uttar Pradesh Auraiya IGCC power station NTPC and BHEL 300 1,774,110 IGCC Deferred
Uttar Pradesh Auraiya Unitech power station Unitech Machines 250 1,478,425 Planning
Uttar Pradesh Bara Thermal Power Project Phase I Jaiprakash Power Ventures 1980 11,709,128 Construction
Uttar Pradesh Bara Thermal Power Project Phase II Jaiprakash Power Ventures 1320 7,806,085 Planning
Uttar Pradesh Bargarh power station Bajaj Hindusthan 1980 11,709,128 Early development
Uttar Pradesh Barkera Mill power station Bajaj Hindusthan 80 473,096 Planning
Uttar Pradesh Bhognipur power station Lanco 2640 15,612,170 Early development
Uttar Pradesh Bilhaur Super Thermal Power Plant NTPC 1320 7,806,085 Early development
Uttar Pradesh Chola power station Tata Power 1320 7,806,085 Planning
Uttar Pradesh Dopaha Thermal Power Plant Uttar Pradesh Power Corporation 1980 11,709,128 Supercritical Early development
Uttar Pradesh Fatehpur power station Uttar Pradesh Power Corporation 1320 7,806,085 Planning
Uttar Pradesh Feroz Gandhi Unchahar Power Project Stage IV NTPC 500 2,956,850 Planning
Uttar Pradesh Harduaganj TPS Extn - Stage III (Kasimpur) Uttar Pradesh Rajya Vidyut 660 3,903,043 Supercritical Planning
Uttar Pradesh Harduaganj TPS Extn Stage II Unit 8 (Kasimpur) Uttar Pradesh Rajya Vidyut 250 1,478,425 Subcritical Newly commissioned 2011
Uttar Pradesh Harduaganj TPS Extn Stage II Unit 9 (Kasimpur) Uttar Pradesh Rajya Vidyut 250 1,478,425 Newly commissioned 2012
Uttar Pradesh Jawaharpur Thermal Project Jawaharpur Vidyut Utpadan Nigam 1320 7,806,085 Planning
Uttar Pradesh Karchana Thermal Power Project Jaypee Group 1980 11,709,128 Deferred
Uttar Pradesh Lalitpur power project (Mirchawar) Bajaj Hindusthan 1980 11,709,128 Early development
Uttar Pradesh Meja Thermal Power Project NTPC and Uttar Pradesh Rajya Vidyut 1320 7,806,085 Supercritical Advanced development
Uttar Pradesh NCTPP IGCC demonstration (Dadri) NTPC 100 591,370 Planning
Uttar Pradesh NCTPP Stage II (Dadri) NTPC 980 5,795,427 Newly commissioned 2010
Uttar Pradesh Obra thermal station extension UP Rajya Vidyut Nigam Ltd 1600 9,461,921 Planning
Uttar Pradesh Panki Thermal Power Station extension UP Rajya Vidyut Nigam Ltd 250 1,478,425 Planning
Uttar Pradesh Parichha power station Unit 5 Uttar Pradesh Rajya Vidyut 250 1,478,425 Newly commissioned 2012
Uttar Pradesh Parichha power station Unit 6 Uttar Pradesh Rajya Vidyut 250 1,478,425 Newly commissioned 2013
Uttar Pradesh Rihand III power station Unit 5 NTPC 500 2,956,850 Newly commissioned 2012
Uttar Pradesh Rihand III power station Unit 6 NTPC 500 2,956,850 Newly commissioned 2013
Uttar Pradesh Rosa Thermal Power Plant Units 1 and 2 Reliance Power 600 3,548,220 Newly commissioned 2010
Uttar Pradesh Rosa Thermal Power Plant Unit 3 Reliance Power 300 1,774,110 Newly commissioned 2011
Uttar Pradesh Rosa Thermal Power Plant Unit 4 Reliance Power 300 1,774,110 Newly commissioned 2012
Uttar Pradesh Singrauli Super Thermal Power Station Stage III NTPC 500 2,956,850 Planning
Uttar Pradesh Tanda power station expansion NTPC 1320 7,806,085 Planning
Uttar Pradesh Welspun Energy Mirzapur power station Welspun Energy 1320 7,806,085 Early development
Uttar Pradesh Welspun Ghazipur project Welspun Energy 1320 7,806,085 Planning
West Bengal Adra Purulia power station NTPC and Indian Railways 1320 7,806,085 Cancelled
West Bengal Bakreswar Thermal Power Station Unit 6 West Bengal Power Development Corp. 660 3,903,043 Planning
West Bengal Balagarh power station CESC 1320 7,806,085 Supercritical Planning
West Bengal Bankura Concast power station Concast Bengal Industries 20.5 121,231 Planning
West Bengal Bhushan Steel West Bengal project Bhushan Steel 1000 5,913,701 Deferred
West Bengal Durgapur Projects Limited power station unit 8 Durgapur Projects Limited 250 1,478,425 Construction
West Bengal Durgapur Steel City power station Unit 1 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2011
West Bengal Durgapur Steel City power station Unit 2 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2012
West Bengal Farakka III power station (Unit 6) NTPC 500 2,956,850 Newly commissioned 2011
West Bengal Haldia Energy power station Phase 1 CESC 600 3,548,220 Construction
West Bengal Haldia Energy power station phase 2 CESC 1400 8,279,181 Planning
West Bengal Katwa Super Thermal Power Project (NTPC) NTPC 1600 9,461,921 Deferred
West Bengal Larsen & Tubro power station Larsen & Tubro 3200 18,923,843 Planning
West Bengal Mejia power station phase II unit 1 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2010
West Bengal Mejia power station phase II unit 2 Damodar Valley Corporation 500 2,956,850 Newly commissioned 2011
West Bengal Raghunathpur Thermal Power Station phase I Damodar Valley Corporation 1200 7,096,441 Subcritical Construction
West Bengal Raghunathpur Thermal Power Station phase II Damodar Valley Corporation 1320 7,806,085 Supercritical Planning
West Bengal Sagardighi Thermal Power Station Phase II West Bengal Power Development Corp. 1000 5,913,701 Subcritical Construction
West Bengal Salboni 1 (CPP-IV) JSW Bengal Steel 300 1,774,110 Construction
West Bengal Salboni 2 and 3 JSW Energy 1320 7,806,085 Supercritical Advanced development
West Bengal Santaldih Thermal Power Station unit 6 NTPC 250 1,478,425 Subcritical Newly commissioned 2011
West Bengal Santildih Thermal Power Station units 7 and 8 NTPC 1320 7,806,085 Supercritical Cancelled

Table 2: Summary statistics for proposed coal plants in India

Status #of Plants Capacity (MW) Annual tons of CO2
Planning 128 154,582 914,148,740
Early development 113 155,262 918,173,014
Advanced development 47 53,340 315,436,801
Construction 98 82,765 489,447,447
Newly commissioned (since 1/1/2010) 112 56,815 335,986,911
Deferred 27 45,230 267,476,687
Cancelled 21 30,420 179,894,778
Unconfirmed 20 24,685 145,979,704
Uncertain 6 11,260 66,588,271
Total 572 614,359 3,633,132,353

Table 3: Projects by state

State #of Proposed Plants Capacity (MW)
Andhra Pradesh 71 79,600
Assam 5 3,050
Bihar 27 37,030
Chhattisgarh 67 70,498
Gujarat 32 36,998
Haryana 7 4,680
Jharkhand 39 43,680
Karnataka 25 28,290
Kerala 1 2,520
Madhya Pradesh 49 57,439
Maharashtra 68 69,525
Meghalaya 2 740
Orissa 52 62,615
Punjab 12 14,120
Rajasthan 21 11,810
Tamil Nadu 33 32,843
Uttar Pradesh 39 38,340
West Bengal 22 20,581
Total 572 614,359

Table 4: Status breakdown by state (Megawatts)

State Planning Early development Advanced development Construction Newly commissioned Deferred Cancelled Uncertain Unconfirmed Total (MW)
Andhra Pradesh 18,565 9,022 11,630 7,503 2,810 10,290 5,720 900 13,160 79,600
Assam 2,300 0 0 750 0 0 0 0 0 3,050
Bihar 5,660 14,380 3,300 4,030 660 1,800 2,040 5,160 0 37,030
Chhattisgarh 14,840 16,325 9,030 16,228 4,335 0 8,540 0 1,200 70,498
Gujarat 11,488 6,960 0 3,190 10,570 2,940 1,600 0 250 36,998
Haryana 660 0 0 0 4,020 0 0 0 0 4,680
Jharkhand 5,660 22,875 660 4,315 3,210 0 2,000 0 4,960 43,680
Karnataka 2,820 11,570 2,780 2,400 1,950 4,000 1,450 0 1,320 28,290
Kerala 0 2,520 0 0 0 0 0 0 0 2,520
Madhya Pradesh 2,570 27,850 7,940 8,809 3,670 5,280 1,320 0 0 57,439
Maharashtra 12,020 9,000 6,870 9,650 8,460 12,080 2,450 5,200 3,795 69,525
Meghalaya 240 500 0 0 0 0 0 0 0 740
Orissa 31,605 11,860 6,640 6,900 3,610 0 2,000 0 0 62,615
Punjab 5,660 1,320 0 3,840 0 2,640 660 0 0 14,120
Rajasthan 1,340 5,620 250 2,770 1,830 0 0 0 0 11,810
Tamil Nadu 18,053 4,240 1,600 4,070 3,560 1,320 0 0 0 32,843
Uttar Pradesh 13,180 11,220 1,320 4,960 5,380 2,280 0 0 0 38,340
West Bengal 7,921 0 1,320 3,350 2,750 2,600 2,640 0 0 20,581
Total 154,582 155,262 53,340 82,765 56,815 45,230 30,420 11,260 24,685 614,359

Notes on names

Articles and resources

References

  1. Using data from the Ministry of Environment and Forest, Prayas found that 192,913 MW of coal and gas capacity had received environmental clearance, with another 508,907 MW in the pipeline and expected to be approved, for a total of 701,820 MW. Of this total, Prayas estimated that coal accounts for 84%, or 589,529 MW. See "Thermal Power Plants on the Anvil," Prayas Energy Group, August 2011.

Related SourceWatch articles

External resources

Andhra Pradesh

Bihar

Chhattisgarh

Gujarat

Karnataka

Madhya Pradesh

Maharashtra

Odisha

Tamil Nadu

Uttar Pradesh

Ultra Mega Power Projects

Other

External articles