Manjung power station

From SourceWatch
Jump to: navigation, search

This article is part of the Coal Issues portal on SourceWatch, a project of CoalSwarm and the Center for Media and Democracy. See here for help on adding material to CoalSwarm.

This article is part of the CoalSwarm coverage of Malaysia and coal
Sub-articles:
Related articles:

The Manjung power station (also known as the Janamanjung power station or the Sultan Azlan Shah Power Plant) is a 4,180 megawatt (MW) coal-fired power station in Perak, Malaysia.

Location

The undated satellite photo below shows the plant, which is located on a reclaimed island off the western coast of the state of Perak, around 10 km south of Lumut and 288 km north of Kuala Lumpurin in the district of Seri Manjung.[1]

Loading map...

Background on Plant

The first 3 x 700 MW subcritical units of the plant were built in 2002 and 2003. They employed "a seawater scrubbing process for flue gas desulphurization".[2][3]

Unit 4

Unit 4 was expected to be the first ultra-supercritical coal plant in Southeast Asia. In 2012 the unit was under construction and scheduled for completion in 2015. It was planned to be 1,080 MW.[1]

Alstom reported that a 1,000 MW supercritical unit 4 was synchronized in September 2014,[4] although other reports are that when the plant entered operation later in April 2015, it was 1,080 MW and ultra-supercritical.[5][6]

The boiler for Unit 4 was manufactured in Wuhan Boiler Company, a Chinese manufacturing facility of which Alstom acquired a 51 per cent stake in 2007.[7]

Unit 5

A contract was signed in August 2013 for construction of Unit 5, which was expected to begin in January 2014 and be completed by October 2017.[8]

In May 2017 it was reported the plant was planned for commissioning in October 2017.[9]

Unit 5 was reported as operational in September 2017.[10]

Project Details of expansion

  • Sponsor: TNB Janamanjung
  • Parent company: TNB
  • Location: Telok Rubiah beach, Manjung, Perak
  • Coordinates: 4.1586, 100.6423 (exact)
  • Status: Operating
  • Capacity: 2,000 MW (Units 4 & 5: 1,000 MW)
  • Type:  Ultra-supercritical
  • Start date:
    • Unit 4: 2015
    • Unit 5: 2017
  • Coal Type: Bituminous and sub-bituminous
  • Coal Source:  
  • Source of financing:

Articles and resources

References

Related SourceWatch articles

External resources