HELP CMD SHINE A LIGHT ON CORRUPTION!

Thanks to a $50,000 challenge grant, your gift will be matched 1-to-1, so every dollar you give today will go twice as far!
GIVE TODAY!

Mariveles Power Plant

From SourceWatch
Jump to: navigation, search

This article is part of the Coal Issues portal on SourceWatch, a project of CoalSwarm and the Center for Media and Democracy. See here for help on adding material to CoalSwarm.

This article is part of the CoalSwarm coverage of the The Philippines and coal
Sub-articles:
Related articles:

The Mariveles Power Plant is a 600-megawatt (MW) coal-fired power station on the Bataan Peninsula, on the island of Luzon in the Philippines, owned by GNPower.

An additional 1,336 MW has been proposed at the same location. The expansion later became referred to as a separate plant, the Dinginin power station.

Location

The map below shows the location of the plant, in Alas-asin Barangay, Mariveles Municipality, Bataan Province.

Loading map...

Background

Mariveles Power Plant is a two-unit, 600-megawatt (MW) coal-fired power station on the Bataan Peninsula, on the island of Luzon in the Philippines, owned by GNPower. The project consists of two 300 MW units using subcritical boilers. The plant went online in April 2013.[1]

Ownership

The plant's owner, GNPower Mariveles Coal Plant Ltd., is jointly owned by U.S. company Sithe Global Power (owned by the Blackstone Group) and the Philippine Ayala Corporation; Ayala acquired a 17.1 percent state in the project for $155 million in December 2012.[2][3]

In October 2016 the Philippines' Aboitiz Power acquired stakes held by Blackstone Group LP for US$1.2 billion.The acquisition involves a 66.1 percent indirect interest in both the Mariveles plant and its expansion.[4]

Description of Expansion

In 2013 plant owner GNPower said it planned to expand the power station. For more information, see Dinginin power station.

Project Details

  • Sponsor: GNPower Mariveles Coal Plant Ltd. Co[5]
  • Parent companies: Sithe Global, Ayala Corporation, Aboitiz Group
  • Location: Alas-asin Barangay, Mariveles Municipality, Bataan Province, Luzon, Philippines
  • Coordinates: 14.4251672, 120.5370176 (exact)[6]
  • Status: Operating
  • Nameplate capacity: 2 x 300 MW
  • Type: Subcritical
  • In service: 2013
  • Coal Type:
  • Coal Source:
  • Estimated annual CO2:
  • Source of financing:

Articles and resources

References

  1. "Sithe Global" Mariveles Station, accessed December 10, 2013.
  2. Doris C. Dumlao, "Ayala Corp. acquires stake in Mariveles coal-fired power plant," Philippine Daily Inquirer, December 17, 2012
  3. "Sithe Global" Mariveles Station, accessed December 10, 2013.
  4. "Philippines' AboitizPower to buy power plant stakes for $1.2 bln," Reuters, Oct 4, 2016
  5. "Approved Coal Plants in the last two years," Greenpeace, accessed December 2013
  6. "GN Coal Power Plant, Alasasin, Mariveles, Bataan," Wikimapia, accessed December 2013

Related SourceWatch articles

External resources

External articles